Final Regional Local Input Points Assigned

At its July 13th, 2016 meeting, the TAC of the Isothermal RPO accepted the draft local input points assignments with no changes. Click here to see a spreadsheet with all 21 projects considered. The 13 projects to be assigned regional local input points have a ‘100’ in the second-to-last column (Points Assigned).