Final Regional Point Assignments-IRPO

The TAC of the Isothermal RPO accepted at its July 13th, 2016 meeting, the draft Regional Point Assignments without changes. Isothermal RPO will thus be assigning its 1300 points to 13 projects. They are the ones that have a ‘100’ in the second-to-last column, Points Assigned, of the spreadsheet shown above.

Both comments and trackbacks are currently closed.