R-2233B–US 221 in Rutherford County

R-2233B Maps

See below for links to maps on NCDOT’s website. There are three (3) maps showing the BA and BB sections. The BB section was funded in 2016-2025 STIP. Currently, property acquisition is currently on-going and construction is slated for 2021. The BA section was funded in the draft 2018-2027 STIP. Currently, property acquisition is scheduled for FY 2021 and construction in FY 2023 (updated January 2019).

r2233b_rdy_dphm_sht1_fs.pdf (Shows BA section only)

r2233b_rdy_dphm_sht2_fs.pdf (BA and BB sections–see arrow marking change)

r2233b_rdy_dphm_sht3_fs.pdf (BB section)